Leave a Message

Thank you for your message. I will be in touch with you shortly.

Explore Properties
Background Image

Two Years at Greenway, and Raleigh Hills Elementary Finally Comes Home

August 27, 2026

For two school years, the fenced lot where Raleigh Hills Elementary used to stand has just sat there behind chain link and equipment, while the kids who belong to that building have been riding buses to Greenway Elementary instead. If you've lived in Raleigh Hills through any of it, you've probably assumed the district was doing what districts usually do with old schools: patching a tired building, maybe adding a wing, eventually handing it back with fresh paint and new carpet.

That is not what happened. The building coming back online this fall is not a renovation of the school that closed in 2024. It is a full replacement, and the reason tells you more about what was actually wrong with the old one than most people in the neighborhood probably realized.

What Was Actually Wrong With the Old Building

Raleigh Hills Elementary dates to 1927, making it the second oldest school in the Beaverton School District. By the time the district put it up for a full rebuild, the building wasn't just dated. According to the district's own project materials, the school had a specific list of failures that went well past cosmetic wear:

  • Steam pipes that were failing
  • A roof in poor condition
  • A sanitary waste system that couldn't handle the size of the school
  • Seismic deficiencies serious enough that much of the building was considered at risk of partial or full collapse in an earthquake

That last point is the one that reframes everything else. This wasn't a building that needed updating. It was a building the district had determined could fail structurally in a seismic event, which is a different category of problem than old wiring or a leaky roof, and it explains why the response was a full teardown and rebuild rather than a renovation timeline measured in months.

The Bond Nobody Talked About

The rebuild is being funded through Beaverton's 2014 and 2022 bond programs, and it carries a price tag of $67 million. That number gets lost easily, because the 2022 bond's headline project was the new Beaverton High School, a $723 million undertaking with a 300,000-square-foot building that dominated local coverage through 2025 and 2026. Raleigh Hills Elementary's rebuild sat inside that same bond, quietly, as one of several elementary projects funded alongside the marquee high school work.

It's worth sitting with that contrast for a second. A neighborhood elementary school, serving a few hundred pre-K through fifth grade students, got a $67 million capital project, funded by the same voters who approved the district's largest high school build in decades. That's not a small commitment for a single-neighborhood school, and it's a useful data point if you've ever wondered how seriously the district treats the older, smaller buildings tucked into residential areas like Raleigh Hills versus the schools that get the press.

Two School Years at Greenway

Demolition started in the summer of 2024. The Raleigh Hills Elementary office closed on site in mid-June that year and reopened at Greenway Elementary on August 5, 2024, which is where Raleigh Hills students have attended class for the 2024-25 and 2025-26 school years while their own building came down and went back up.

That's a longer stretch than most people picture when they hear "school rebuild." Two full school years is enough time for a kindergartner to become a second grader without ever setting foot in the building the rest of the neighborhood still calls "their" elementary school. It's also long enough that the daily rhythm around the old site, the version of Raleigh Hills where families walked or drove a few blocks to drop off kids at a neighborhood school, simply paused. Whatever traffic pattern, foot traffic, or after-school pickup routine used to center on that building didn't happen for two years. This fall, it starts again.

A Campus Built to Not Look Like a Campus

What's replacing the 1927 building is a genuinely different kind of structure. The new Raleigh Hills Elementary is built as three separate buildings connected by skywalks, using roughly 400,000 pounds of steel, a scale of construction that has nothing in common with the single aging schoolhouse it's replacing. It will house pre-K through fifth grade, same as before, but the physical footprint and the engineering behind it are built for a building expected to last generations, not one more round of patchwork repairs.

The detail that says the most about how the district thought about this project isn't the steel tonnage. It's the architecture. Design teams working on the rebuild deliberately moved toward what district materials describe as a more residential architectural style, specifically to fit in with the surrounding neighborhood, rather than defaulting to the kind of institutional, big-box school design that shows up in a lot of modern rebuilds. That's a choice, not an accident. Raleigh Hills is a low-density, established neighborhood of detached single-family homes with a leafy, settled character, and the district apparently decided the school anchoring that neighborhood should look like it belongs there rather than like a relocated office park.

What Comes Back This Fall

If you've been driving past that fenced lot for two years without much more than a passing glance, the thing to understand is that what reopens this fall isn't the same school with new paint. It's a structurally sound, seismically current building that cost as much as a mid-size commercial development, sized and shaped to serve the neighborhood for decades, and deliberately designed to read as part of Raleigh Hills rather than apart from it.

For a neighborhood that has spent two years without its elementary school actually present, that's a real return, not just a logistics update. The kids who've been bused to Greenway come back to a school in their own neighborhood. The building that anchored Raleigh Hills for nearly a century gets replaced by one built to anchor it for the next one.

If you're curious about how Raleigh Hills fits into the broader west-side Portland suburbs, or you're weighing it against nearby neighborhoods like Lake Oswego, you can find more on the Raleigh Hills neighborhood page. And if this is the kind of local detail that makes you want a fuller picture of what's happening in the neighborhood you already call home, or the one you're thinking about next, Kelly Calabria is always glad to talk it through. Request a free home valuation or buyer consultation whenever you're ready.

Follow Us On Instagram